ARENA PLAN COMMISSION
March 2, 2009
PRESENT: KayDee Maxwell, Bob Murphy, Bill Gauger, Dave Lucey, Terry Denruiter, John Wright, Wayne Schutte,
Cheryl Schmidt, Mark Hottmann, Rod Anding
OTHERS: Randy Terronez, Minnie
Gauger, Ingmar Nelson, John Halverson, Bill Buckridge
The meeting was called to
order.
Murphy motioned to approve
the minutes from February 2, 2009 meeting. Schutte seconded, motion passed.
Randy Terronez ,
Administrator for Iowa
County - discussion about
the 2016 Olympics. Chicago partnering with Wisconsin for three bike events that will be in Dane and Iowa County.
The Town of Arena
would be affected on Aug. 20, 2016. The bike racers would be going on Zwettler
and Pinnacle Road. The Olympics is considered a FEMA type event
and we can be reimbursed for expenses. It is not required that any road
improvements be made. However, we could take advantage of the Federal money and
redo the roads for the race. There would only be closures of the roads on the
actual race day, probably for a ½ day. The Town decides if we want to sign off
on the agreement from the Olympic Committee. There will be a meeting in the
Town of Brigham
on Tuesday the 10th.
Bill Buckridge - conditional
use permit to manufacture cultured stone in the existing buildings. Current
zoning is B2. Traffic - foreseeing two loads going out per day. There would be
minimal noise, about the noise of a palm sander. Would like to work later in
the day, 8-5pm, to eventually employee high school students. Looking at working
6 days a week. Would like to be a wholesaler for contractors. Storage of the
product would be mostly inside. Would the zoning need to be B3 for the
property? Bill should ask the County how the property needs to be zoned. The
personal property taxes need to be paid on the property before a decision can
be made by the committee. Bill's phone 206-6447. The committee tabled the discussion
till we find out more on zoning from the County.
Bill & Minnie Gauger - requesting a rezone and land
division. Current zoning is 3.8 acres zoned B2 for mini warehouses. Also, a
long north & south strip zoned B4 for the salvage yard. Instead of having
50 -100 ft. buffers along the salvage yard, bring out the buffer to the lot
lines. Then, rezone the North part of B4 to AR1. This will be lot 1 where
Gauger's want to build a house. Then there is a second proposed building site,
lot 3. It is zoned Ag now and needs to be AR1, 28 acres. Anding motioned to
rezone lot 1 from B4 and Ag to AR 1, 23.41 acres; move the lot line of lot 2
out to the edge of the easement, in front of the mini warehouses; rezone lot 3,
28.0+- acres, from Ag to AR1, with one building site. Schutte seconded, motion
passed. Construction on the home will begin early spring. Gauger's paid the
$500 fee.
Anding motioned to adjourn.
Hottmann seconded, motion passed.