ARENA PLAN COMMISSION
May 3, 2010
PRESENT: John Wright, Rod Anding, Dave Lucey, Terry Denruiter, Bill Gauger, Cheryl Schmidt, KayDee
Maxwell, Wayne Schutte, Mark Hottman, Bob Murphy
OTHERS: Dick & Mary Lockman, Ingmar Nelson, Bob
& Renee McKinley,
Meeting was called to order.
Schutte motioned to approve the minutes from the April 5, 2010 meeting. Anding
seconded, motion passed.
Bob McKinley - wants to
withdraw his request for a bed and breakfast. The County wants them to rezone
and they don't want to do that, rezone to B2.
Eric Drachenberg wanted to
talk to the Township about hazardous mitigation planning. He left a website
www.swrpc.org/iowahazard. A plan for whom to call, what to do in emergency
situations in the township. Eric Drachenberg seems like the logical person to
call and head up a situation.
Public meeting at the Barneveld Legion at 7:00
on May 6 about the WI Working Lands Initiative.
Ingmar Nelson - proposing
less than 1 acre lots (6.512 acres), rezone to RB1 for cabin rental and tourist
cottages. Current zoning is A1. Building site 1, 2, 3, 4 is current A-Frame, 5,
& 6 (5 new building sites). Change zoning within that space (lot 2) to RB1.
Lot lone would move to West. The dashed lines
are the meandering line where the stakes won't ever move, he owns all the way
to the river though. Cabins are 1000 - 1200 sq. ft.. Tourist cottage with
plumbing and sewer, would like to combine well and septic, worst case there
would be one per site. Has 111 acres total. Driveway, has talked to Allsum,
there is no problem as long as people stay on the drive. That would put 7 users
on the driveway, he has an easement through Gary Heck's property that he would
then use for his house. It is a dirt drive now so it is not up to Town
standards. Mark Hottmann read Section H-9 about getting an impact study.
Non-residents can not exceed 600 sq. ft.. Ingmar is proposing houses at 1000
sq. ft. and he doesn't have enough building sites. However, that is why he is
changing the zoning to RB1. Pg. 17 of the Iowa County Zoning says tourist
cottage is under RB1. Needs 5 acres minimum for RB1. Tourist Cottage
definition: a building of no more than 2 dwelling units. Ingmar thought he
would have a gazebo for tourists, but did not mention any other conditional
uses. He would start building this year. Gauger would like a letter from
Allsum's agreeing to the easement and multiple users. Section I, reasons that
the tourist cabins are a good idea, what they do for the township. The planning
committee wants and impact statement. What does he have for fire protection?
Thought about building the structures out of concrete. Are they seasonal? No,
rented year around. Concerned about the sq. ft. and people living in them all
year. We will basically have a subdivision with houses and driveways. Not doing
anything with lot 1 zoned Ag. Lucey and Nelson will try and meet with Scott
Godfrey Wed. morning. Individual parking at each cabin. He will have to get a
permit from the Lower WI River Way.
Anding motioned to approve the rezoning from A1 to RB1 on Lot 2, 6.512 acres,
also the conditional use of five tourist cottages (contingent on the definition
and number of cottages allowed at the County) with an existing house,
contingent upon getting all the required permits and the Town receiving an
impact study based on Section H-III-5, a letter from the adjacent landowners,
Allsum, about the easement, and a five year moratorium on additional
conditional uses for Ingmar Nelson. Schutte seconded, motion passed. He will have to apply for a driveway and
building permit for each cottage. We would like blueprints for the houses.
Cheryl Schmidt and Mark
Hottmann are up for renewing their positions on the Plan Commission. Anding
motioned to nominate John Wright for Chairman. Murphy seconded, motion passed.
Schutte motioned to nominate Rod Anding for Vice Chairman. Wright seconded,
motion passed.
The township needs to define
what we want for an impact statement.
Murphy motioned to adjourn.
Hottman seconded, motion passed.